BBM vs MBB
load break switches.

Understand the transition terminology before reviewing a four-position sectionalizing switch.

Updated · ZEEYI ELECTRIC

BBM opens the existing connection before making the next; MBB makes the next connection before opening the existing one.

The terms describe a transition, rather than the number of stable switch positions. The correct choice follows the system’s approved connection sequence.

The distinction at a glance.

Break-before-make and make-before-break concepts
REVIEW POINTBBMMBB
Full nameBreak-before-makeMake-before-break
Connection transitionExisting path opens first.Next path closes first.
Continuity considerationA transition interruption may occur.Connection overlap may maintain continuity in a suitable design.
What to verifyApproved sequence and acceptable interruption.Approved sequence and suitability of overlapping connections.

Conceptual comparison only. Exact connections and transition behavior depend on the selected switch design and circuit.

Selection / Four-position family

Specify the diagram.
Not just the acronym.

A request for a four-position switch should identify the connections at each stable position and the intended transitions. The labels BBM and MBB alone do not define every position or establish compatibility between part numbers.

Send the circuit or position diagram with the inquiry and ask for confirmation of the proposed model’s diagram. Have the complete arrangement reviewed by the transformer’s system designer.

Explore the FYN33 four-position family ↗

Discussion / Before quotation

Questions to resolve.

  • Which terminals or circuits should be connected in each position?
  • What transition sequence is required between positions?
  • What continuity requirement has the system designer specified?
  • Which model drawing and electrical-duty data need approval?

This article explains terminology for selection discussions. It does not authorize source paralleling or provide an operating sequence.

Technical references

Product family information: ZEEYI official loadbreak switch overview.

General terminology and connection examples: Eaton catalog CA800005EN. Manufacturer-specific ratings and drawings in that reference do not specify ZEEYI products.

Contact / Technical selection

Bring the drawing.
Start the discussion.

Share your circuit, required ratings and mounting drawing so the model can be reviewed against your project.

EXPORT SALESYoyo Shi+86 150 5877 8024yoyo@zeeyielec.comChat on WhatsApp ↗Wenzhou, Zhejiang, China