ZEEYI ELECTRIC / Transformer switching

Oil-immersed
load break switches.

Two-position and four-position.
For oil-filled transformers.

Explore oil-immersed load break switches, compare configurations and bring your requirements to our team.

Visit company website ↗
OIL-IMMERSED LOAD BREAK SWITCHESPRODUCT SELECTION / TECHNICAL DISCUSSION / QUOTATION

01 / Our product families

Find the arrangement.
Refine the details.

Start with your switching configuration. Explore the product page for ratings, application notes and selection guidance.

01 / FYB & BYFI

Two-position
load break switches.

ON/OFF switching arrangements for oil-filled transformer designs. Explore the family and discuss the model that matches your assembly.

ON / OFFSINGLE / THREE PHASE
Explore two-position switches ↗
02 / FYN33

Four-position
sectionalizing switches.

Multi-position configurations for sectionalizing and transfer arrangements. Compare model-dependent BBM and MBB options.

BBM / MBBSECTIONALIZING
Explore four-position switches ↗

Buyer questions / Start here

Choose the circuit.
Then choose the switch.

What does an oil-immersed load break switch do?

It makes or breaks load current within its specified duty in an oil-filled transformer assembly. It is not a substitute for a circuit breaker or coordinated fault protection. Review the selected model’s electrical duty and installation drawing before approval.

Compare electrical requirements ↗
What is the difference between two-position and four-position switches?

The two-position family supports ON/OFF arrangements. The four-position family is a starting point for sectionalizing and transfer arrangements with multiple circuit positions. The required position diagram and transition sequence determine the model, not the position count alone.

Compare both switch families ↗
Where can I find ZEEYI switch catalogues and drawings?

Download the two-position or four-position PDF catalogue below. For project approval, request the exact model datasheet, dimensional drawing, position diagram and applicable test records from ZEEYI. Family information is a preliminary reference, not an approval drawing.

View both PDF catalogues ↗
What should I include in a load break switch inquiry?

Send your voltage class, current, frequency, phase arrangement, circuit diagram, mounting drawing, quantity, destination and target date. Identify any required test documents. ZEEYI can then review the configuration and quotation requirements.

Use the selection checklist ↗

02 / A practical next step

From your drawing
to a clearer discussion.

01 / SHARE

Start with your requirements.

Bring your transformer drawing, electrical requirements, switching sequence and estimated quantity.

02 / REVIEW

Work through the configuration.

Discuss the product family, mechanical fit and model-specific documents needed for your review.

03 / PLAN

Prepare the next step.

Include your destination and target date when asking about quotation, samples and delivery.

View the selection checklist ↗

Downloads / Product catalogues

Product details.
Take them with you.

Download the catalogue for your switch configuration, or open the PDF to review it online.

Technical guides / Start with the question

A clearer specification.
A more useful conversation.

03 / Contact ZEEYI

A product question.
A project to discuss.

Talk to us about product selection, technical documents or your next quotation.

EXPORT SALESYoyo Shi+86 150 5877 8024yoyo@zeeyielec.comChat on WhatsApp ↗Wenzhou, Zhejiang, China